City Praised for Stormwater Progress

Green banner with DPW logo and text "Department of Public Works Press Release"

October 4, 2013 (BALTIMORE, MD) — In a letter to Baltimore City Department of Public Works (DPW) Director Alfred H. Foxx, the Maryland Department of the Environment (MDE) praised the Department’s projects to restore impervious surfaces and to protect the Chesapeake Bay.
 
“The successful completion of these restoration projects are often complex and costly and the City is commended for this significant work that is improving water quality,” wrote MDE Program Manager Brian S. Clevenger. “MDE congratulates you and your staff for the successful endeavors completed under the NPDES (National Pollutant Discharge Elimination System) stormwater program….”
 
This praise comes as a result of a review of the department’s NPDES municipal stormwater permit annual report, covering a period of 18 months, ending June 30, 2012. This permit mandates strict environmental controls to protect the water quality of the City’s streams and the Chesapeake Bay.
 
Baltimore City has made great strides in reducing stormwater pollutants through a variety of methods. These include street sweeping and inlet cleaning, stream restoration and impervious surface removal. Since its inception, Baltimore’s impervious surface restoration program has reached 2,472 acres, of which 139 acres have been completed in the last eighteen months.
 
Director Foxx noted: “We are very pleased to have received this commendation from the State of Maryland. DPW is committed to continued enhanced and innovative methods to improve the water quality of our streams, our harbor and the Bay. It is essential that we do this for the health of our environment and for the economic growth of our city and region.”

Related Stories

The Department of Public Works is Now Accepting Public Comment on the Modified Sanitary Sewer Consent Decree Revised Operation and Maintenance Plan

The Modified Consent Decree Revised Operation and Maintenance (O&M) Plan has officially been released by the Baltimore City Department of Public Works (DPW) and is available on the DPW website for review and comment in accordance with the Modified Sanitary Sewer Consent Decree (MCD). DPW will accept public comments pertaining to this document for 30 days, through November 16, 2024Comments may be submitted directly to Michael.Shipman@baltimorecity.gov.

Baltimore City and County Submit Initial Water Service Line Inventory to MDE Part of a Nationwide Effort to Remove Lead Lines from Water Systems

On Tuesday, October 15, the Baltimore City Department of Public Works (DPW) and the Baltimore County Department of Public Works and Transportation (DPWT) submitted their initial water service line inventory to the Maryland Department of the Environment (MDE). This submission is part of a nationwide effort, led by the U.S. Environmental Protection Agency (EPA), to identify and eliminate lead and galvanized pipes from water distribution systems.

DPW is Now Accepting Public Comments on the Modified Sanitary Sewer Consent Decree Revised Emergency Response Plan 

The Baltimore City Department of Public Works (DPW)  has announced the release of its Revised Emergency Response Plan (ERP), a reference tool to be used by City personnel during a sanitary sewer overflow or reported building backup emergency. The Modified Sanitary Sewer Consent Decree (MCD) requires DPW to submit a revised Emergency Response Plan to protect the public health and welfare in the event of an unpermitted release, spill, or discharge of pollutants from the sewer collection system or in the event of a reported building backup.