DPW Investigating Severed Sewer Main in Clipper Mill

Green banner with DPW logo and text "Department of Public Works Press Release"

Investigation by the Baltimore City Department of Public Works (DPW) found failing sanitary sewer pipes that had been constructed within a 5-foot diameter storm drain tunnel in the Clipper Mill area. Problems discovered late last week include a severed main sewer pipe, other disconnections and leaks, and debris within the storm system.

More than 10,000 gallons of sewage is estimated to have discharged to the Jones Falls since the discovery of the failing system. DPW engineers and maintenance workers are seeking immediate, short-term actions to abate the problem, including repairing and re-aligning the severed sewer main, cleaning the storm drain, and working with the property owner to repair portions of the private sewer system.

Long-term actions will include determining how to get the sanitary sewer line out of the storm drain.

The public is reminded to avoid contact with urban waterways due to the risk of pollution. For information about health concerns as a result of sewer overflows please go to http://health.baltimorecity.gov/sanitary-sewer-overflows-sso.

Related Stories

The Department of Public Works is Now Accepting Public Comment on the Modified Sanitary Sewer Consent Decree Revised Operation and Maintenance Plan

The Modified Consent Decree Revised Operation and Maintenance (O&M) Plan has officially been released by the Baltimore City Department of Public Works (DPW) and is available on the DPW website for review and comment in accordance with the Modified Sanitary Sewer Consent Decree (MCD). DPW will accept public comments pertaining to this document for 30 days, through November 16, 2024Comments may be submitted directly to Michael.Shipman@baltimorecity.gov.

Baltimore City and County Submit Initial Water Service Line Inventory to MDE Part of a Nationwide Effort to Remove Lead Lines from Water Systems

On Tuesday, October 15, the Baltimore City Department of Public Works (DPW) and the Baltimore County Department of Public Works and Transportation (DPWT) submitted their initial water service line inventory to the Maryland Department of the Environment (MDE). This submission is part of a nationwide effort, led by the U.S. Environmental Protection Agency (EPA), to identify and eliminate lead and galvanized pipes from water distribution systems.

DPW is Now Accepting Public Comments on the Modified Sanitary Sewer Consent Decree Revised Emergency Response Plan 

The Baltimore City Department of Public Works (DPW)  has announced the release of its Revised Emergency Response Plan (ERP), a reference tool to be used by City personnel during a sanitary sewer overflow or reported building backup emergency. The Modified Sanitary Sewer Consent Decree (MCD) requires DPW to submit a revised Emergency Response Plan to protect the public health and welfare in the event of an unpermitted release, spill, or discharge of pollutants from the sewer collection system or in the event of a reported building backup.