Broken Sewer Leads to Underground Leak

Green banner with DPW logo and text "Department of Public Works Press Release"

Routine sampling by Baltimore City Department of Public Works (DPW) employees last Friday, Aug. 25, found an underground overflow of sewage traced to a broken sewer pipe in the 2500 block of W. Lexington St. Crews were unable to repair the break, but on Monday were able to complete a pumping bypass that effectively ended the overflow by sending the sewage into a sewer manhole further downstream.

DPW engineers estimate that 44,250 gallons of sewage discharged from the time the break was discovered until the pumping bypass was put into place. A contractor will complete repairs to the mainline.

Though unusually intense, frequent rains in recent weeks infiltrated and overwhelmed some sections of the sewer system.  The overflow on West Lexington Street is different than, and unrelated to those wet-weather overflows.

None of the sewer overflow reached the street. It did, however, enter the storm drain system and made its way to the Gwynns Falls.

The Baltimore City Health Department and the Maryland Department of the Environment were notified of the release.

The public is reminded to avoid contact with urban waterways due to the risk of pollution. For information about health concerns as a result of sewer overflows please go to http://health.baltimorecity.gov/sanitary-sewer-overflows-sso.

Related Stories

The Department of Public Works is Now Accepting Public Comment on the Modified Sanitary Sewer Consent Decree Revised Operation and Maintenance Plan

The Modified Consent Decree Revised Operation and Maintenance (O&M) Plan has officially been released by the Baltimore City Department of Public Works (DPW) and is available on the DPW website for review and comment in accordance with the Modified Sanitary Sewer Consent Decree (MCD). DPW will accept public comments pertaining to this document for 30 days, through November 16, 2024Comments may be submitted directly to Michael.Shipman@baltimorecity.gov.

Baltimore City and County Submit Initial Water Service Line Inventory to MDE Part of a Nationwide Effort to Remove Lead Lines from Water Systems

On Tuesday, October 15, the Baltimore City Department of Public Works (DPW) and the Baltimore County Department of Public Works and Transportation (DPWT) submitted their initial water service line inventory to the Maryland Department of the Environment (MDE). This submission is part of a nationwide effort, led by the U.S. Environmental Protection Agency (EPA), to identify and eliminate lead and galvanized pipes from water distribution systems.

DPW is Now Accepting Public Comments on the Modified Sanitary Sewer Consent Decree Revised Emergency Response Plan 

The Baltimore City Department of Public Works (DPW)  has announced the release of its Revised Emergency Response Plan (ERP), a reference tool to be used by City personnel during a sanitary sewer overflow or reported building backup emergency. The Modified Sanitary Sewer Consent Decree (MCD) requires DPW to submit a revised Emergency Response Plan to protect the public health and welfare in the event of an unpermitted release, spill, or discharge of pollutants from the sewer collection system or in the event of a reported building backup.