Accidental Release of Magnesium Hydroxide

Green banner with DPW logo and text "Department of Public Works Press Release"

The Baltimore City Department of Public Works (DPW) announces the accidental release of 856 gallons of magnesium hydroxide into the Patapsco River. The chemical, which is used during the wastewater pretreatment process, started to leak at 1 p.m. on the afternoon of Friday, Dec. 8.

The spill was stopped at 8 a.m. on Saturday, Dec. 9.  DPW has started to clean up the spill, which distorted the water color of the Patapsco River, and reported the release to the Maryland Department of the Environment.

The leak started from a broken line on a tank located at the City-installed facility on the south side of the County's Patapsco Pumping Station.  

Magnesium hydroxide, known commonly as "milk of magnesia," is used in the sewage treatment process for odor control and to help with corrosion resistance. 

 

Related Stories

The Department of Public Works is Now Accepting Public Comment on the Modified Sanitary Sewer Consent Decree Revised Operation and Maintenance Plan

The Modified Consent Decree Revised Operation and Maintenance (O&M) Plan has officially been released by the Baltimore City Department of Public Works (DPW) and is available on the DPW website for review and comment in accordance with the Modified Sanitary Sewer Consent Decree (MCD). DPW will accept public comments pertaining to this document for 30 days, through November 16, 2024Comments may be submitted directly to Michael.Shipman@baltimorecity.gov.

Baltimore City and County Submit Initial Water Service Line Inventory to MDE Part of a Nationwide Effort to Remove Lead Lines from Water Systems

On Tuesday, October 15, the Baltimore City Department of Public Works (DPW) and the Baltimore County Department of Public Works and Transportation (DPWT) submitted their initial water service line inventory to the Maryland Department of the Environment (MDE). This submission is part of a nationwide effort, led by the U.S. Environmental Protection Agency (EPA), to identify and eliminate lead and galvanized pipes from water distribution systems.

DPW is Now Accepting Public Comments on the Modified Sanitary Sewer Consent Decree Revised Emergency Response Plan 

The Baltimore City Department of Public Works (DPW)  has announced the release of its Revised Emergency Response Plan (ERP), a reference tool to be used by City personnel during a sanitary sewer overflow or reported building backup emergency. The Modified Sanitary Sewer Consent Decree (MCD) requires DPW to submit a revised Emergency Response Plan to protect the public health and welfare in the event of an unpermitted release, spill, or discharge of pollutants from the sewer collection system or in the event of a reported building backup.